色色综合网66,一级a卡片在线观看,成人免费a视频,中文无码电影,国产AV一区二区三区

  • Hebei Xiangyuan Machinery manufacturing Co.,LTD!

Hot key words:Brake drum   Hub   Brake pads

news information

CONTACT:

Manager Lv:0086-13831914368
Manager Li:0086-15131910018
Post Code:055350
Tel:0086-319-6505298
Fax:0086-319-6505298
E-mail:lyxyqp@aliyun.com

ADDRESS:

Company Add:Workshop 6, Xingye Road, Economic Development Zone, Longyao County,Xingtai City,Hebei Province

News

Current Location:Index >> News >> News

TIME:2022.04.15

A complete hub-shaped cavity is obtained by iron mold sand coating process, and the next sand core is used to directly cast the hub parts. The cast castings eliminate the defects of shrinkage porosity and shrinkage cavity in the hub, and the cast hub has stable quality and compact internal structure, which effectively improves the appearance and internal quality of the castings and reduces the rejection rate of the castings. Compared with clay sand casting, the weight of the cast castings is reduced by 10%, which greatly improves the production efficiency and saves a lot of time, manpower, equipment and other costs.
The invention relates to a casting method of a heavy truck hub, which is characterized in that the casting method adopts an iron mold sand coating process for casting, and specifically comprises the following steps:
(1) Design a set of models with the same shape as the hub of a heavy truck as the master model;
(2) Design and manufacture a set of core box consistent with the hub cavity of heavy truck;
(3) making an iron mold shape associated with the master mold, wherein the gap between the iron mold shape and the master mold is 5-7 mm;
(4) fixing the core box in step (2) on a core making machine, heating to 170-200 DEG C, closing the mold, clamping the sand shooting plate in place, and shooting sand.

(5) fixing the master mold on a sand shooting machine, heating to 230-270 DEG C, closing the shape of the iron mold, clamping the sand shooting plate in place, then shooting sand and curing for 25 seconds;
(6) shooting the coated sand onto the pre-designed iron mold shape through the sand hole of the sand shooting machine, so that the coated sand fills the cavity between the mold and the iron mold shape, and after 30 seconds, forming the mold, and naturally cooling for 25-30 seconds, the upper and lower iron mold shape cavities coated with sand are obtained in turn, and the sand cores are lowered to the corresponding positions, so that the box can be closed and poured;
(7) raw materials mainly made of pig iron and scrap steel are mixed and then put into a smelting furnace for heating, and the temperature of molten iron is 1530 DEG C;
(8) spheroidizing the molten iron by using a flushing method;
(9) After the box is closed, clamped and fixed, the treated molten iron is poured, the pouring time is 8 minutes, and the pouring temperature is controlled at 1330-1430 DEG C, so that the required nodular cast iron hub blank parts are obtained, and the castings are taken out of the box after heat preservation for 12 minutes.

超碰人人草人人干| AV国产操逼| 大香蕉AV片| 久艹精品在线| 亚洲一区二区无码网站| 日韩性交无码| A黄免费观看| 性爱网五月天| 婷婷激情A片网| 亚洲av资源网| 我要着一级黄色片| 久久成人无码黄片| 大香蕉超碰| 欧美特黄生活片| 黄色片,A片| 在线黄色一片av| 成人毛片黄色电影A片| 日韩无码色| 高清一本黄色片| A片日韩无码| 免费在线黄色AV| 免费一级A毛片| 91AV片| av五月在线网| 91av导舷,| 一级a级操逼视频| 欧美日日干| 黄色无码av激情| 亚洲天堂电影AV| wwwcom久久夜色| 蜜臀精品在线网| 老鸭窝黄一区免费| 潮吹岛国| 东京热App下载成人| 久艹在线视频观看| 午夜成人福利10000| av小网站| 中国一级黄AV| 91超碰网一区| 日韩无码高清A片| 九草在线|