色色综合网66,一级a卡片在线观看,成人免费a视频,中文无码电影,国产AV一区二区三区

  • Hebei Xiangyuan Machinery manufacturing Co.,LTD!

Hot key words:Brake drum   Hub   Brake pads

news information

CONTACT:

Manager Lv:0086-13831914368
Manager Li:0086-15131910018
Post Code:055350
Tel:0086-319-6505298
Fax:0086-319-6505298
E-mail:lyxyqp@aliyun.com

ADDRESS:

Company Add:Workshop 6, Xingye Road, Economic Development Zone, Longyao County,Xingtai City,Hebei Province

News

Current Location:Index >> News >> News

TIME:2022.04.15

A complete hub-shaped cavity is obtained by iron mold sand coating process, and the next sand core is used to directly cast the hub parts. The cast castings eliminate the defects of shrinkage porosity and shrinkage cavity in the hub, and the cast hub has stable quality and compact internal structure, which effectively improves the appearance and internal quality of the castings and reduces the rejection rate of the castings. Compared with clay sand casting, the weight of the cast castings is reduced by 10%, which greatly improves the production efficiency and saves a lot of time, manpower, equipment and other costs.
The invention relates to a casting method of a heavy truck hub, which is characterized in that the casting method adopts an iron mold sand coating process for casting, and specifically comprises the following steps:
(1) Design a set of models with the same shape as the hub of a heavy truck as the master model;
(2) Design and manufacture a set of core box consistent with the hub cavity of heavy truck;
(3) making an iron mold shape associated with the master mold, wherein the gap between the iron mold shape and the master mold is 5-7 mm;
(4) fixing the core box in step (2) on a core making machine, heating to 170-200 DEG C, closing the mold, clamping the sand shooting plate in place, and shooting sand.

(5) fixing the master mold on a sand shooting machine, heating to 230-270 DEG C, closing the shape of the iron mold, clamping the sand shooting plate in place, then shooting sand and curing for 25 seconds;
(6) shooting the coated sand onto the pre-designed iron mold shape through the sand hole of the sand shooting machine, so that the coated sand fills the cavity between the mold and the iron mold shape, and after 30 seconds, forming the mold, and naturally cooling for 25-30 seconds, the upper and lower iron mold shape cavities coated with sand are obtained in turn, and the sand cores are lowered to the corresponding positions, so that the box can be closed and poured;
(7) raw materials mainly made of pig iron and scrap steel are mixed and then put into a smelting furnace for heating, and the temperature of molten iron is 1530 DEG C;
(8) spheroidizing the molten iron by using a flushing method;
(9) After the box is closed, clamped and fixed, the treated molten iron is poured, the pouring time is 8 minutes, and the pouring temperature is controlled at 1330-1430 DEG C, so that the required nodular cast iron hub blank parts are obtained, and the castings are taken out of the box after heat preservation for 12 minutes.

95精品在线视频| 91`97av| 亚洲AVaV在线网| 色情欧美一级A片| 亚洲天堂v| 黄色AV无码| 在线观看A片视频| 成人黄色五月天| 能在线看的av| 交换玩弄极品美少妇| 五月丁香色色AV| Aa成人电影院| 天堂中国av| 国产Aa一级黄色色片| 日韩资源 日韩有码| 国产Av特级片| 日本欧美黄色A片| 免费A片在线播放| 怡红院中文无字码AV| 国i二区一区| 日韩精品A片在线观看| 可以看的黄色av| gogo无码大胆| 91视频一级片| 国产精品片| 超碰AV在线免费观看| 中文字幕成人电影| 日韩无码AV搞一下| 欧美一卡久久| 无码AV网址| 97AV超碰| 成人黄色A片| 火狐无码专区| 九九久久99无码| 狼友一二| 高潮的A片激情孕妇| 黄色三级a片影视| 超碰97人人约| av无码有码| 日本成人社区| 日韩A V小电影|